CAPACITY RANGE20-100 t
DYNAMIC ACCURACY±0.5%
LEAD TIME~60 days
TRADE TERMSEXW–DDP
SPEC BAR / Nominal engineering data from our standard build · WIM dynamic accuracy is ±0.5% of gross weight · full specification table below.

SERVICE / LIFECYCLE

Installation, Commissioning and Maintenance

A weighbridge is only as accurate as its foundation and alignment. Our in-house engineering, manufacturing, installation and maintenance teams stay on the project from drawing to calibration.

Most weighing errors blamed on the instrument are actually installation errors: a foundation that settled, a deck that is not level, a cable run that picked up noise. Because we keep engineering, manufacturing, installation and maintenance in one team, there is a single point of responsibility from the issued drawing through to the first calibration.

For static decks we supply foundation drawings, alignment tolerances, wiring diagrams and pit or pitless options. The 58 mm WIM plate changes the civil picture considerably: it is direct-buried, so the pit and much of the drainage work disappear. On turnkey projects our own installation and commissioning crew handles the build; on distributor-led projects we provide the same documentation set and remote commissioning guidance.

After handover the maintenance team supports calibration checks, spare load cells, indicator replacement and remote diagnostics. The line is trusted in 70+ countries with an annual output of 10,000+ units, so the spares and the documentation are designed for sites far from the factory, not just for local service calls.

Weighbridge deck being positioned during installation at a yard
FIG. 01 — Deck positioning during site installation.

SCOPE / DELIVERABLES

Service scope

SERVICE SCOPETSW / LIFECYCLE
ParameterValueNotes
DeliverableFoundation and layout drawingsIssued before fabrication
AlignmentDeck level and approach tolerancesDocumented in the install pack
WiringLoad cell to indicator diagramShielded cable routing specified
CalibrationFactory calibration and on-site verificationStatic and WIM configurations
CommissioningTurnkey or remote-guidedOwn installation team or distributor
MaintenanceCalibration checks, spares, diagnosticsIn-house service team
CoverageTrusted in 70+ countriesAnnual output 10,000+ units
All figures are nominal values from our standard configuration. Confirm against the issued drawing before order.
Documentation
Foundation drawings, alignment tolerances and wiring diagrams.
Commissioning
Turnkey on-site crew or remote guidance for distributor-led builds.
Calibration
Factory calibration plus on-site verification and recorded configuration.
Spares
Load cells, indicators and consumables from the in-house maintenance team.
Direct-bury weighpad prepared during commissioning
FIG. 02 — Direct-bury weighpad at commissioning stage.

PROCESS / SITE

From drawing to first weighing

  1. Site survey — Confirm soil, drainage, approach length and vehicle wheelbase.
  2. Drawing issue — Release foundation and layout drawings for approval.
  3. Fabrication — Build the deck to the agreed capacity and module count.
  4. Civil works — Prepare the pit or the shallow recess for a direct-bury WIM plate.
  5. Set and align — Level the deck, fit load cells and route shielded cabling.
  6. Calibrate — Verify against test loads and record the configuration.
  7. Handover — Train operators and pass over the documentation pack.
Pitless advantage

Where the site allows it, a direct-bury 58 mm WIM plate removes most of the civil works and the drainage headaches that come with a deep pit. We will tell you honestly when a conventional static deck is still the better choice.

NEXT / SPECIFY

Match the service to the capacity

FAQ

Installation and service questions

Do you provide installation guidance?

Our own installation and commissioning teams handle turnkey projects, and for distributor-led builds we supply foundation drawings, alignment tolerances, wiring diagrams and remote commissioning guidance.

How do you handle after-sales service?

Our in-house maintenance team supports calibration checks, spare load cells, indicator replacement and remote diagnostics. Distributors receive the same documentation set we use internally.

What is the typical lead time for a truck weighing scale?

Around 60 days from a confirmed drawing and order. The slot covers fabrication, surface treatment, load-cell fitting, factory calibration and packing. We confirm the exact window with the quotation rather than printing a blanket promise.

Should I choose a portable or a fixed weighbridge?

A fixed U-section deck suits permanent high-cycle sites. Portable and axle-load pads suit temporary works, enforcement checks or sites where a civil pit is not viable. We quote both against the same spec sheet.

Does the WIM plate need a concrete pit?

No. The 58 mm sensor plate is designed for direct burial, which removes most of the civil works. It is rated IP68 for the buried environment.

REQUEST / ENGINEERING DESK

Get Spec & Quote

Send the capacity, deck, site and incoterm. An engineer reads the request and returns a documented specification with the quotation.

  • Full specification table and drawing reference
  • Construction and coating figures in writing
  • Lead time, MOQ, payment and incoterm stated
  • Static and weigh-in-motion options compared

Direct: guankai@xhlmarketing.com

We reply with the full spec sheet, drawing reference and a quotation. No obligation.